The valley has been shaken before
West Covina sits on the floor of the San Gabriel Valley, and the valley has had hard shaking within living memory. The 1987 Whittier Narrows quake was centered a short drive west of the city, and in 1991 the Sierra Madre quake rattled the foothills to the north. Brick chimneys laid without steel took a lot of the visible damage in both: tops snapped off near the roof, stacks twisted on their bases, and bricks came down on patios and through roofs.
Many older brick chimneys in the area were built that way, with no steel inside. If yours is one of them, there are a few ways to make it less likely to come down, and they sit at very different prices. Cranston Chimney Pros writes them up side by side so you can choose by budget, by how you use the fireplace, and by how long you plan to stay in the house.
Why the top is the weak point
The part of a chimney above the roof stands free. Below the roofline the house wraps around it; above, nothing holds it sideways. When the ground moves, the house sways one way and the heavy brick top keeps going the other, and it breaks right where the support ends. Weak old mortar makes that break easier.
That is why every option below focuses on the top: hold it, rebuild it stronger, or remove it.
Option one: bracing
A steel brace ties the stack above the roof back to the roof framing, so the top is held at a second point instead of standing free. Where the chimney runs up an outside wall, steel straps can also tie it to the house framing at the floor and ceiling lines.
Good fit: a stack that is plumb, with joints in good order, on a fireplace you still use.
What it buys: a top that is less likely to snap off at the roofline.
What it leaves alone: the mortar. A brace holds the stack as one piece only if it already is one piece. On crumbling joints we price repointing first and say so on the quote.
Of the three options this is usually the smallest line.
Option two: relay the top with steel inside
The stack comes down to the roofline, or to the first sound course, and goes back up with vertical steel set in grout through the new brick, finished with a new crown and cap. From the street it looks like the chimney you had; inside it is a different piece of work.
Good fit: a top that is already loose, leaning or badly weathered, on a house where you want to keep the fireplace and the look.
What it buys: a new upper section with steel in it, and fresh joints, crown and cap in one job.
What it leaves alone: brick below the point where we stop. The quote states that point and what we do if the brick there turns out softer than it looked.
This sits in the middle on price, and it is the option most owners pick when the top is already in poor shape.
Option three: take it down
If the fireplace has not been lit in years, the chimney can be taken down below the roofline, the roof patched over, and the remaining flue sealed. A lighter version keeps a short section and tops it with a framed chase around a metal flue, so a gas appliance can still vent through it.
Good fit: a fireplace nobody uses, or a remodel where a gas unit is going somewhere else in the house.
What it buys: no heavy brick top left to fall.
What it leaves alone: the fireplace's use as a wood fire. Once the masonry flue is gone, so is the open wood fire.
The price depends heavily on height and roof type, and it can land below or above option two.
What decides the price
- Mortar condition. Sound joints keep bracing simple; failed joints add repointing or push toward a relay.
- Height above the roof. More brick to brace, relay or carry down.
- Roof type. Clay tile and steep pitches take longer to protect and patch.
- Whether the fireplace stays in use. That decides whether removal is on the table at all.
- The flue inside. Shaking that cracks the outside often cracks tiles too, and a liner may join the quote.
Ask for all three retrofit options and tell us when the house was built, whether you still burn in the fireplace, and whether the chimney was repaired after an earlier quake. The quote that follows prices each option on its own line.
After a shake
When a quake has already rattled the house, the outside can look fine while tiles inside the flue have cracked. A Level 2 camera inspection, $415 on our list, records the full height of the flue so you know before the next fire. Until then, keep the patio and walkway under the chimney clear, and leave the fireplace cold.
What can wait
Bracing a sound chimney is planning, not a rush job, and it can be booked at a quiet time of year. A loose top, brick on the roof, or a gap opening between the chimney and the wall is different, and goes at the top of the quote.
Related reading
Choosing before the next one
To see the three options priced for your own chimney, reach us through the contact page. We look at the top, test the joints, and put each choice in writing with what it does and does not cover.
Want Figures Like These for Your Chimney?
Cranston Chimney Pros prices every fault on a line of its own, offers more than one fix where that exists, and tags each line urgent, before the rains or optional. Request an estimate in West Covina or elsewhere across West Covina and Los Angeles County.





